Facility Details: New Cooperative, Inc. – Gruver
| NPDES General Permit #1-3 - Storm Water |
The Anderson's Inc., Grain Storage Facility - Construction |
07/16/2014 |
|
| Group 1 Grain Elevators |
Great Lakes Coop - Gruver |
04/14/2009 |
|
| Group 1 Grain Elevators |
The Andersons, Inc - Gruver |
12/09/2012 |
|
| Group 1 Grain Elevators |
Maxyield Cooperative - Gruver |
04/22/2018 |
|
| Group 1 Grain Elevators |
Maxyield - Gruver |
07/27/2021 |
|
Wastewater - NPDES General Permit #1-3 - Storm Water
Air - Group 1 Grain Elevators
Above Ground Storage Tank - AST
|
| AST12728 | Oct 14, 2014 | Jan 31, 2015 | Regulated Active | To AST Site |
| 5153 |
Grain and field beans |
| 424510 |
Grain and Field Bean Merchant Wholesalers |
No Enforcement Action Information for this site.
Group 1 Grain Elevators Feature List
| EP2 |
Emission Point |
400 m (Poor) |
|
| EP3 |
Emission Point |
400 m (Poor) |
|
| EP4 |
Emission Point |
400 m (Poor) |
|
| EP6 |
Emission Point |
400 m (Poor) |
|
| EP8 |
Emission Point |
400 m (Poor) |
|
| EP7 |
Emission Point |
400 m (Poor) |
|
| EP1 |
Emission Point |
400 m (Poor) |
|
| EP5 |
Emission Point |
400 m (Poor) |
|